🤖 New AI Estimate

📊 Rates: —
API Connected
Total Estimates
Annual Quoted
Avg $/Part
Suppliers Analyzed

⚡ Quick Actions

📋 Recent Estimates

Loading recent estimates...
1
Process
2
Material & Part
3
Country & Economics
4
AI Results

⚙️ Select Manufacturing Process

🪨 Material

📐 Part Data

Machine depreciation spread over program life instead of machine useful life
Removes depreciation & interest from machine burden rate

⚡ Configuration

Process
Material
Weight
Volume

🌍 Quotation Country

📅 Economic Year

Enter any year 1900–2099. Unknown years will be researched automatically.

🔧 Tooling Location

Tooling is often manufactured in a different country than the part.

📦 Shipping Route

Specify where parts are manufactured and where they'll be delivered for freight cost estimation.

💰 Economic Data

Select a country to preview economic data.

🤖

No Results Yet

Run an AI estimate to see a detailed cost breakdown, material analysis, and production recommendations here.

🔬 CAD to Cost — AI-Powered Estimation

Upload your CAD file, engineering drawing, or photo — the AI will determine the optimal manufacturing process and generate a complete cost estimate automatically.

📐
CAD File
.STL • .STEP
📄
Engineering Drawing
.JPG • .PNG • .PDF
📷
Part Photo
.JPG • .PNG • .WebP
📊
BOM (Excel)
.XLSX • .CSV
🏗️
Assembly CAD
.STL (Multi-body)
💡 Material, tolerances, finish, or anything the drawing/CAD might not show

🔄 Engineering Change Impact

Upload an engineering change document (PDF/PPTX/Excel) and optionally a supplier quote. The AI will analyze the changes and estimate the cost impact.

📄
ECN Document
PDF, PPTX, Excel, or Image
💰
Supplier Quote (optional)
PDF, Excel

💬 Supplier Quote Negotiation Coach

Upload a supplier quote (PDF/Excel/PPTX). The AI reads it, compares with your estimate, and gives you specific negotiation talking points.

📎
Upload Supplier Quote
PDF, Excel, PPTX, or image of quote
🧠 Example Queries — click to try
Total Estimates
Avg $/Part
Top Process
Total Annual Quoted

📋 Estimate History

Version Part Process Volume Total/Part Annual Total Date Actions
Loading...

📥 Import Historical Quotes

Upload supplier quote files for AI learning
📁
Drop CSV or Excel file here
or click to browse · Supports .csv and .xlsx

📊 Imported Data

0 quotes loaded

No quotes imported yet. Upload a CSV or Excel file above.

🎯 Column Mapping Guide

The system auto-detects these column headers:

Part Name
Part Number
Process
Material
Weight (kg)
Volume
Price
Tooling Cost
Supplier

⚙️ Process Store

Subscription Plan
Processes Used
0 / 5
Monthly Cost
$149/mo

📦 Active Processes

📊 Rate Database

Labor rates, energy costs, exchange rates from BLS · INEGI · Eurostat · IMF

🏪 Process Marketplace

🤖
⚡ Process Creator SUPERADMIN
Describe any manufacturing process — AI generates and saves it to the marketplace
👋 Describe the manufacturing process you want to add. E.g. "Plastic injection molding" or "CNC milling for aluminum"

Or browse pre-built process templates below. Activate any to add it to your toolkit.